Cena s DPH / bez DPH
Hlavní stránka>BS EN 12390-19:2023 Testing of hardened concrete. Determination of electrical resistivity
sklademVydáno: 2023-03-01
BS EN 12390-19:2023 Testing of hardened concrete. Determination of electrical resistivity

BS EN 12390-19:2023

Testing of hardened concrete. Determination of electrical resistivity

Formát
Dostupnost
Cena a měna
Anglicky Zabezpečené PDF
K okamžitému stažení
4500 Kč
Čtěte normu po dobu 1 hodiny. Více informací v kategorii E-READING
Čtení normy
na 1 hodinu
450.00 Kč
Čtěte normu po dobu 24 hodin. Více informací v kategorii E-READING
Čtení normy
na 24 hodin
1350.00 Kč
Anglicky Tisk
Skladem
4500 Kč
Označení normy:BS EN 12390-19:2023
Počet stran:22
Vydáno:2023-03-01
ISBN:978 0 539 18383 2
Status:Standard
Popis

BS EN 12390-19:2023


This standard BS EN 12390-19:2023 Testing of hardened concrete. Determination of electrical resistivity is classified in these ICS categories:
  • 91.100.30 Concrete and concrete products
This document describes two methods for measuring the electrical resistivity of concrete in water saturated conditions: the volumetric method (see 3.1.3), which is the reference method, and the surface method (see 3.1.4). The document gives the procedure to calibrate the surface method by means of the reference-volumetric method. Both methods give the same resistivity result, provided the provisions of the present document (using the Form Factor (Ff) for equivalence between them) are followed. NOTE The volumetric method is applicable to cast specimens or cores, while the surface method is suitable for use on cast specimens, cores and on construction sites, but not all of these applications are covered in this document. The method can be applied to the normal range of concretes covered by current standards. It does not cover concretes containing metallic components or made with porous aggregates. The use of resistivity to assess the potential for corrosion of reinforcement in existing structures is not specified in this document. The use of resistivity to test cores taken from an existing structure, which require pre-conditioning by water saturation, is not covered in this document.