Cena s DPH / bez DPH
Hlavní stránka>BS EN IEC 62239-1:2018 Process management for avionics. Management plan Preparation and maintenance of an electronic components management plan
Sponsored link
sklademVydáno: 2018-12-13
BS EN IEC 62239-1:2018 Process management for avionics. Management plan Preparation and maintenance of an electronic components management plan

BS EN IEC 62239-1:2018

Process management for avionics. Management plan Preparation and maintenance of an electronic components management plan

Formát
Dostupnost
Cena a měna
Anglicky Zabezpečené PDF
K okamžitému stažení
9734 Kč
Čtěte normu po dobu 1 hodiny. Více informací v kategorii E-READING
Čtení normy
na 1 hodinu
973.40 Kč
Čtěte normu po dobu 24 hodin. Více informací v kategorii E-READING
Čtení normy
na 24 hodin
2920.20 Kč
Anglicky Tisk
Skladem
9734 Kč
Označení normy:BS EN IEC 62239-1:2018
Počet stran:80
Vydáno:2018-12-13
ISBN:978 0 580 51201 8
Status:Standard
Popis

BS EN IEC 62239-1:2018


This standard BS EN IEC 62239-1:2018 Process management for avionics. Management plan is classified in these ICS categories:
  • 49.060 Aerospace electric equipment and systems
  • 03.100.50 Production. Production management
  • 31.020 Electronic components in general

This part of IEC 62239 defines the requirements for developing an electronic components management plan (ECMP) to guarantee to customers that all of the electronic components in the equipment of the plan owner are selected and applied in controlled processes compatible with the end application and that the technical requirements detailed in Clause 4 are accomplished.

In general, the plan owner of a complete electronic components management plan (ECMP) is the avionics original equipment manufacturer (OEM).

NOTE

SAE EIA-STD-4899 can be used to comply with the requirements of IEC 62239‑1 where applicable (see Annex C), to enable the plan owner to harmonise its plan for both documents.

This document provides an aid in the aerospace certification process.

Although developed for the avionics industry, this process can be applied by other industrial sectors.