Vážení zákazníci, v letošním roce budeme expedovat poslední objednávky ve středu 18. 12. 2024.

Těšíme se s vámi na shledanou od pondělí 06. 01. 2025.

 

Cena s DPH / bez DPH
Hlavní stránka>BS EN IEC 62381:2024 - TC Tracked Changes. Automation systems in the process industry. Factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT)
Sponsored link
sklademVydáno: 2024-10-07
BS EN IEC 62381:2024 - TC Tracked Changes. Automation systems in the process industry. Factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT)

BS EN IEC 62381:2024 - TC

Tracked Changes. Automation systems in the process industry. Factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT)

Formát
Dostupnost
Cena a měna
Anglicky Zabezpečené PDF
K okamžitému stažení
12586 Kč
Anglicky Tisk
Skladem
12586 Kč
Označení normy:BS EN IEC 62381:2024 - TC
Počet stran:129
Vydáno:2024-10-07
ISBN:978 0 539 33651 1
Status:Tracked Changes
Popis

BS EN IEC 62381:2024 - TC


This standard BS EN IEC 62381:2024 - TC Tracked Changes. Automation systems in the process industry. Factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT) is classified in these ICS categories:
  • 25.040.40 Industrial process measurement and control
  • 25.040.01 Industrial automation systems in general
IEC 62381:2024 defines requirements and checklists for the factory acceptance test (FAT), the factory integration test (FIT), the site acceptance test (SAT), and the site integration test (SIT). These tests are carried out to demonstrate that the automation system meets the requirements of the applicable specification. This document provides a means for all parties, including the owner, the buyer, and the vendor, to clearly establish and agree on the scope of activities and responsibilities involved in performing these tests in order to achieve a timely delivery and acceptance of the automation system. The activities specified in this document can be used to develop test plans adapted to the specific requirements of the process/plant/equipment. The annexes of this document contain checklists which are available for consideration when preparing specific test procedures and documentation for a specific automation system. This edition includes the following significant technical changes with respect to the previous edition: a) General re-organization of the standard; b) Current technology incorporated; c) Optional factory integration test (FIT) added; d) Replaced the forms in the annexes with detailed checklists of activities which can be used to develop project-specific test plans; and e) Provided additional references to other applicable standards.