Cena s DPH / bez DPH
Hlavní stránka>BS EN IEC 63132-5:2023 Guidance for installation procedures and tolerances of hydroelectric machines Bulb turbines and generators
Sponsored link
sklademVydáno: 2023-06-05
BS EN IEC 63132-5:2023 Guidance for installation procedures and tolerances of hydroelectric machines Bulb turbines and generators

BS EN IEC 63132-5:2023

Guidance for installation procedures and tolerances of hydroelectric machines Bulb turbines and generators

Formát
Dostupnost
Cena a měna
Anglicky Zabezpečené PDF
K okamžitému stažení
7564 Kč
Čtěte normu po dobu 1 hodiny. Více informací v kategorii E-READING
Čtení normy
na 1 hodinu
756.40 Kč
Čtěte normu po dobu 24 hodin. Více informací v kategorii E-READING
Čtení normy
na 24 hodin
2269.20 Kč
Anglicky Tisk
Skladem
7564 Kč
Označení normy:BS EN IEC 63132-5:2023
Počet stran:38
Vydáno:2023-06-05
ISBN:978 0 539 16756 6
Status:Standard
Popis

BS EN IEC 63132-5:2023


This standard BS EN IEC 63132-5:2023 Guidance for installation procedures and tolerances of hydroelectric machines is classified in these ICS categories:
  • 27.180 Wind turbine energy systems
  • 29.160.20 Generators
  • 07.060 Geology. Meteorology. Hydrology
  • 27.140 Hydraulic energy engineering
The purpose of this guide is to establish, in a general way, suitable procedures and tolerances for the installation of bulb turbine and generator. This guide presents a typical assembly and whenever the words "turbine" and "generator" are used in this part, it refers to bulb turbine and generator. There are many possible ways to assemble a unit. The size of the machine, the design of the machine, the layout of the powerhouse, the sequence of concreting or the delivery schedule of the components are some of the elements that could result in additional steps, or the elimination of some steps and/or assembly sequences. It is understood that a publication of this type will be binding only if, and to the extent that, both contracting parties have agreed upon it. The guide excludes matters of purely commercial interest, except those inextricably bound up with the conduct of installation. It also excluded to specifications of the civil works but this aspect of the work should be taken into consideration during the assembly of the units. Wherever the guide specifies that documents, drawings or information is supplied by a manufacturer (or by manufacturers), each individual manufacturer will furnish the appropriate information for their own supply only.