Cena s DPH / bez DPH
Hlavní stránka>BS IEC 60300-3-7:1999 Dependability management. Application guide Application guide. Reliability stress screening of electronic hardware
sklademVydáno: 1999-09-15
BS IEC 60300-3-7:1999 Dependability management. Application guide Application guide. Reliability stress screening of electronic hardware

BS IEC 60300-3-7:1999

Dependability management. Application guide Application guide. Reliability stress screening of electronic hardware

Formát
Dostupnost
Cena a měna
Anglicky Zabezpečené PDF
K okamžitému stažení
7320 Kč
Čtěte normu po dobu 1 hodiny. Více informací v kategorii E-READING
Čtení normy
na 1 hodinu
732.00 Kč
Čtěte normu po dobu 24 hodin. Více informací v kategorii E-READING
Čtení normy
na 24 hodin
2196.00 Kč
Anglicky Tisk
Skladem
7320 Kč
Označení normy:BS IEC 60300-3-7:1999
Počet stran:38
Vydáno:1999-09-15
ISBN:0 580 32937 2
Status:Standard
Popis

BS IEC 60300-3-7:1999


This standard BS IEC 60300-3-7:1999 Dependability management. Application guide is classified in these ICS categories:
  • 31.020 Electronic components in general
  • 03.120.01 Quality in general

This part of IEC 60300 serves as an application guide to a reliability stress screening process for electronic hardware. The concept, purpose and justification of the screening process are explained. The main elements of a screening programme are stated, together with the general planning procedure. This standard is intended as a guide and should be used in conjunction with one of the IEC reliability stress screening standards, ("tools" in the toolbox concept), referenced in clause 15, based on the screening process application level.

This standard gives guidance in cases where it is essential that early failures be removed from the items manufactured in order to deliver them to the customer when the problems causing the early failures are solved. The standard also gives guidance on where the reliability stress screening should be carried out, i.e. component level, subsystem level, or system level (see figure 1), and can also be used where steps to reduce the risk of early failures are included in a contract.

This standard is aimed at personnel in the contract department, project management, product development, process management, production, quality control and purchasing.