Cena s DPH / bez DPH
Hlavní stránka>BS IEC/IEEE 63113:2021 Nuclear facilities. Instrumentation important to safety. Spent fuel pool instrumentation
sklademVydáno: 2021-05-11
BS IEC/IEEE 63113:2021 Nuclear facilities. Instrumentation important to safety. Spent fuel pool instrumentation

BS IEC/IEEE 63113:2021

Nuclear facilities. Instrumentation important to safety. Spent fuel pool instrumentation

Formát
Dostupnost
Cena a měna
Anglicky Zabezpečené PDF
K okamžitému stažení
6240 Kč
Čtěte normu po dobu 1 hodiny. Více informací v kategorii E-READING
Čtení normy
na 1 hodinu
624.00 Kč
Čtěte normu po dobu 24 hodin. Více informací v kategorii E-READING
Čtení normy
na 24 hodin
1872.00 Kč
Anglicky Tisk
Skladem
6240 Kč
Označení normy:BS IEC/IEEE 63113:2021
Počet stran:30
Vydáno:2021-05-11
ISBN:978 0 539 17727 5
Status:Standard
Popis

BS IEC/IEEE 63113:2021


This standard BS IEC/IEEE 63113:2021 Nuclear facilities. Instrumentation important to safety. Spent fuel pool instrumentation is classified in these ICS categories:
  • 27.120.20 Nuclear power plants. Safety

1.1 General

This document provides criteria for spent fuel pool instrumentation for nuclear power generating stations and other nuclear facilities. The document applies to water filled spent fuel pools where the water volume is necessary to prevent a release of fission products that exceeds allowed operational limits.

1.2 Purpose

The purpose of this document is to establish design, performance, qualification, and display criteria for spent fuel pool instrumentation for normal operation, anticipated operational occurrences, design basis events, and design extension conditions (including severe accident conditions).

1.3 Application

This document applies only to instrumentation for monitoring the condition of the spent fuel pool, i.e., pool level, pool temperature, and area radiation. It does not apply to control systems that are related to the spent fuel pool such as: the pool cooling systems, isolation valve control, crane instrumentation and control, or refuelling machine instrumentation and control.

In some plant designs some of the instruments covered by this document also provide inputs to protection system functions. Such instruments must also comply with requirements for protection systems that are given elsewhere.

The requirements applied to the systems and components performing these functions depend on how they contribute to the safety of the spent fuel pool.