Cena s DPH / bez DPH
Hlavní stránka>BS ISO 10784-1:2011 Space systems. Early operations Spacecraft initialization and commissioning
Sponsored link
sklademVydáno: 2012-01-31
BS ISO 10784-1:2011 Space systems. Early operations Spacecraft initialization and commissioning

BS ISO 10784-1:2011

Space systems. Early operations Spacecraft initialization and commissioning

Formát
Dostupnost
Cena a měna
Anglicky Zabezpečené PDF
K okamžitému stažení
4650 Kč
Čtěte normu po dobu 1 hodiny. Více informací v kategorii E-READING
Čtení normy
na 1 hodinu
465.00 Kč
Čtěte normu po dobu 24 hodin. Více informací v kategorii E-READING
Čtení normy
na 24 hodin
1395.00 Kč
Anglicky Tisk
Skladem
4650 Kč
Označení normy:BS ISO 10784-1:2011
Počet stran:20
Vydáno:2012-01-31
ISBN:978 0 580 66617 9
Status:Standard
Popis

BS ISO 10784-1:2011


This standard BS ISO 10784-1:2011 Space systems. Early operations is classified in these ICS categories:
  • 49.140 Space systems and operations

A general definition of initialization is that it begins at separation of the spacecraft (SC) from the launcher. In some cases, a more exact definition will be that initialization begins in flight, upon planned change in mode or state of the SC from the launch configuration. Commissioning is completed when the SC, including its payload, is certified for initial mission operations. Prior to certification for mission operations, the SC is described as a test article in the three parts of ISO 10784. ISO 10784 does not include a requirement for contingency plans, but does include a statement of the need for contingency planning.

This part of ISO 10784 outlines general descriptive information for SC initialization and commissioning as might be appropriate for programme management, project engineering or programme test documentation. Since the SC is considered a test article at this phase of its operational life, ISO 17566 is used as a normative reference in constructing the initialization plan and the commissioning report. It provides SC manufacturers, SC operators and other stakeholders with a common language and form to verify and document spacecraft initialization and commissioning prior to normal SC mission operations.