Vážení zákazníci, v letošním roce budeme expedovat poslední objednávky ve středu 18. 12. 2024.

Těšíme se s vámi na shledanou od pondělí 06. 01. 2025.

 

Cena s DPH / bez DPH
Hlavní stránka>BS ISO 16404:2020 Space systems. Programme management. Requirements management
Sponsored link
sklademVydáno: 2020-05-12
BS ISO 16404:2020 Space systems. Programme management. Requirements management

BS ISO 16404:2020

Space systems. Programme management. Requirements management

Formát
Dostupnost
Cena a měna
Anglicky Zabezpečené PDF
K okamžitému stažení
6820 Kč
Čtěte normu po dobu 1 hodiny. Více informací v kategorii E-READING
Čtení normy
na 1 hodinu
682.00 Kč
Čtěte normu po dobu 24 hodin. Více informací v kategorii E-READING
Čtení normy
na 24 hodin
2046.00 Kč
Anglicky Tisk
Skladem
6820 Kč
Označení normy:BS ISO 16404:2020
Počet stran:24
Vydáno:2020-05-12
ISBN:978 0 539 05808 6
Status:Standard
Popis

BS ISO 16404:2020


This standard BS ISO 16404:2020 Space systems. Programme management. Requirements management is classified in these ICS categories:
  • 49.140 Space systems and operations

This document presents the requirements for requirements management (RM) for space projects.

This document addresses the space programme/project management requirements, applicable through a top-down approach in a contractual relationship between customers and suppliers.

The objective of this document is to state and establish a common reference framework for all the customers and suppliers in the space sector to deploy requirements management for all space products and projects.

This document on requirements management includes

  1. a definition of the requirements management scope for the space sector,

  2. the standard processes for requirements management within the product lifecycle management, and

  3. a set of rules for requirements management activities to be implemented by the actors (customers and suppliers), including rules derived from best practices.

The primary target audience for this document includes

  1. the requirements management/systems engineering process owners of the customers and suppliers,

  2. the programme/project managers managing the space programmes, and

  3. the chief engineers and the quality managers.

The term "programme" is understood as a group of several projects. Both “programme” and “project” can be used in the same context throughout this document.

In addition, this document allows customer/supplier flexibility in its implementation and tailoring.