Vážení zákazníci, v letošním roce budeme expedovat poslední objednávky ve středu 18. 12. 2024.

Těšíme se s vámi na shledanou od pondělí 06. 01. 2025.

 

Cena s DPH / bez DPH
Hlavní stránka>BS ISO 27919-2:2021 Carbon dioxide capture Evaluation procedure to assure and maintain stable performance of post-combustion CO<sub>2</sub> capture plant integrated with a power plant
Sponsored link
sklademVydáno: 2021-10-20
BS ISO 27919-2:2021 Carbon dioxide capture Evaluation procedure to assure and maintain stable performance of post-combustion CO<sub>2</sub> capture plant integrated with a power plant

BS ISO 27919-2:2021

Carbon dioxide capture Evaluation procedure to assure and maintain stable performance of post-combustion CO<sub>2</sub> capture plant integrated with a power plant

Formát
Dostupnost
Cena a měna
Anglicky Zabezpečené PDF
K okamžitému stažení
10230 Kč
Čtěte normu po dobu 1 hodiny. Více informací v kategorii E-READING
Čtení normy
na 1 hodinu
1023.00 Kč
Čtěte normu po dobu 24 hodin. Více informací v kategorii E-READING
Čtení normy
na 24 hodin
3069.00 Kč
Anglicky Tisk
Skladem
10230 Kč
Označení normy:BS ISO 27919-2:2021
Počet stran:72
Vydáno:2021-10-20
ISBN:978 0 580 51526 2
Status:Standard
Popis

BS ISO 27919-2:2021


This standard BS ISO 27919-2:2021 Carbon dioxide capture is classified in these ICS categories:
  • 13.020.40 Pollution, pollution control and conservation

This document provides definitions, guidelines and supporting information for evaluating and reporting (with respect to the basic design items ongoing, and the operational results of a reference plant or unit as feedback) to ensure the (designed) performance of a PCC plant integrated with a host power plant. The PCC plant separates CO2 from the power plant flue gas in preparation for subsequent transportation and geological storage. The physical system being addressed is a single power plant, with an optional auxiliary unit to provide thermal energy required for the PCC plant, and a single PCC plant as described in ISO 27919-1 .

The formulas and methods to assure and maintain reliable performance, presented in this document, describe issues addressed during the design and construction phases and practices that document reliability and availability during routine operation. These practices would also guide ongoing maintenance programmes.

This document does not provide guidelines for benchmark, comparison or assessment studies for PCC plant operations using different capture technologies (i.e. absorbents), nor does it specify appropriate operating conditions such as temperature etc.