DD CEN ISO/TS 27469:2011 Petroleum, petrochemical and natural gas industries. Method of test for fire dampers

DD CEN ISO/TS 27469:2011

Petroleum, petrochemical and natural gas industries. Method of test for fire dampers

Formát
Dostupnost
Cena a měna
Anglicky Zabezpečené PDF
K okamžitému stažení
6448 Kč
Čtěte normu po dobu 1 hodiny. Více informací v kategorii E-READING
Čtení normy
na 1 hodinu
644.80 Kč
Čtěte normu po dobu 24 hodin. Více informací v kategorii E-READING
Čtení normy
na 24 hodin
1934.40 Kč
Anglicky Tisk
Skladem
6448 Kč
Označení normy:DD CEN ISO/TS 27469:2011
Počet stran:24
Vydáno:2011-10-31
ISBN:978 0 580 74053 4
Status:Standard
Popis

DD CEN ISO/TS 27469:2011


This standard DD CEN ISO/TS 27469:2011 Petroleum, petrochemical and natural gas industries. Method of test for fire dampers is classified in these ICS categories:
  • 75.180.10 Exploratory, drilling and extraction equipment

This Technical Specification specifies a method for determining the following:

  1. ability of fire dampers installed in ventilation systems to prevent the spread of fire and heat through designated fire divisions; typical ratings are given in ISO 13702:1999, Table C.5.

  2. fire damper operational reliability in the petroleum, petrochemical and natural gas industries, particularly offshore installations;

    NOTE It is planned to determine the methodology during the testing and development phase.

  3. ability of fire dampers installed in ventilation systems to withstand blast overpressures that may result from the explosion of a flammable gas.

This Technical Specification applies to different start-up operations for different types of furnace and, therefore, tolerances in test conditions at the beginning of the test are not described in detail. The fire test enables only a limited assessment of the actuating mechanism being carried out and additional tests can be necessary to fully evaluate its operational reliability.