Vážení zákazníci, v letošním roce budeme expedovat poslední objednávky ve středu 18. 12. 2024.

Těšíme se s vámi na shledanou od pondělí 06. 01. 2025.

 

Menu
0
Total price
0 €
PRICES include / exclude VAT
Homepage>BS 476-31.1:1983 Fire tests on building materials and structures Methods for measuring smoke penetration through doorsets and shutter assemblies
Sponsored link
sklademVydáno: 2014-03-31
BS 476-31.1:1983 Fire tests on building materials and structures Methods for measuring smoke penetration through doorsets and shutter assemblies

BS 476-31.1:1983

Fire tests on building materials and structures Methods for measuring smoke penetration through doorsets and shutter assemblies

Format
Availability
Price and currency
Anglicky Secure PDF
Immediate download
165.37 €
You can read the standard for 1 hour. More information in the category: E-reading
Reading the standard
for 1 hour
16.54 €
You can read the standard for 24 hours. More information in the category: E-reading
Reading the standard
for 24 hours
49.61 €
Anglicky Hardcopy
In stock
165.37 €
Označení normy:BS 476-31.1:1983
Počet stran:14
Vydáno:2014-03-31
ISBN:978 0 580 85691 4
Status:Standard
DESCRIPTION

BS 476-31.1:1983


This standard BS 476-31.1:1983 Fire tests on building materials and structures is classified in these ICS categories:
  • 13.220.50 Fire-resistance of building materials and elements

This Section of this British Standard describes a method for measuring smoke penetration, as represented by the measurement of air leakage rate, through doorsets and vertically oriented shutter assemblies under ambient temperature conditions. This method is used to evaluate the performance of a fire door used for smoke control purposes but gives no information on the fire resistance of a fire door for which the methods described in BS 476-22 are applicable.

NOTE The titles of the publications referred to in this standard are listed on the inside back cover.


This method measures air leakage of door and shutter assemblies under ambient temperature conditions as being representative of smoke penetration occurring from the early stages or at a remote position from a fire occurring in a building.