Vážení zákazníci, v letošním roce budeme expedovat poslední objednávky ve středu 18. 12. 2024.

Těšíme se s vámi na shledanou od pondělí 06. 01. 2025.

 

Menu
0
Total price
0 €
PRICES include / exclude VAT
Homepage>BS EN 17921:2024 Natural gas fuelling stations. LNG unloading connector
Sponsored link
sklademVydáno: 2024-03-14
BS EN 17921:2024 Natural gas fuelling stations. LNG unloading connector

BS EN 17921:2024

Natural gas fuelling stations. LNG unloading connector

Format
Availability
Price and currency
Anglicky Secure PDF
Immediate download
271.50 €
You can read the standard for 1 hour. More information in the category: E-reading
Reading the standard
for 1 hour
27.15 €
You can read the standard for 24 hours. More information in the category: E-reading
Reading the standard
for 24 hours
81.45 €
Anglicky Hardcopy
In stock
271.50 €
Označení normy:BS EN 17921:2024
Počet stran:24
Vydáno:2024-03-14
ISBN:978 0 539 20232 8
Status:Standard
DESCRIPTION

BS EN 17921:2024


This standard BS EN 17921:2024 Natural gas fuelling stations. LNG unloading connector is classified in these ICS categories:
  • 75.200 Petroleum products and natural gas handling equipment
  • 43.080.10 Trucks and trailers
This document specifies a harmonized unloading connector for LNG road tanker at LNG fuelling stations. This document is also applicable to LNG RID applications. While LNG is also transported by rail, European regulations are organized through the International Carriage of Dangerous Goods by Rail (RID). The same configuration as defined by this document, can be utilized. This document includes requirements for (at least): - functional description of the LNG unloading receptacle and LNG unloading nozzle; - technical layout description of the LNG unloading receptacle. The technical layout description of the LNG unloading nozzle is not part of this document. The basic functional requirement of the LNG unloading connector are as follows: - to prevent leakage of methane during operation and in particular during disconnecting; - easy handling, no spillage and purging with nitrogen during disconnecting. The loading connector between the LNG road tanker and the LNG terminal is not covered by this document. See Figure 1.