Homepage>BS EN 50341-2-8:2017 Overhead electrical lines exceeding AC 1 kV National Normative Aspects (NNA) for FRANCE (based on EN 50341-1:2012)
sklademVydáno: 2017-12-31
BS EN 50341-2-8:2017 Overhead electrical lines exceeding AC 1 kV National Normative Aspects (NNA) for FRANCE (based on EN 50341-1:2012)

BS EN 50341-2-8:2017

Overhead electrical lines exceeding AC 1 kV National Normative Aspects (NNA) for FRANCE (based on EN 50341-1:2012)

Format
Availability
Price and currency
Anglicky Secure PDF
Immediate download
344.76 €
You can read the standard for 1 hour. More information in the category: E-reading
Reading the standard
for 1 hour
34.48 €
You can read the standard for 24 hours. More information in the category: E-reading
Reading the standard
for 24 hours
103.43 €
Anglicky Hardcopy
In stock
344.76 €
Označení normy:BS EN 50341-2-8:2017
Počet stran:70
Vydáno:2017-12-31
ISBN:978 0 580 98811 0
Status:Standard
DESCRIPTION

BS EN 50341-2-8:2017


This standard BS EN 50341-2-8:2017 Overhead electrical lines exceeding AC 1 kV is classified in these ICS categories:
  • 29.240.20 Power transmission and distribution lines
(ncpt) FR.1 Scope of Part 1 and Part 2-8 Part 1 and the present Part 2-8 apply to new overhead lines as defined in 1.1/FR.2 "Definition of a new overhead line". (ncpt) FR.2 Definition of a new overhead line A new overhead line denotes any new overhead electrical line exceeding AC 1 kV built on new foundations and: - flanked by two substations or two terminal towers preceding said substations. or - flanked by a substation or a terminal tower at one end and in a branch situation (including branch tower) or tapping situation at the other end. (ncpt) FR.3 Application to existing overhead lines This standard does not apply to existing overhead lines exceeding AC 1 kV in France. (ncpt) FR.4 Application to overhead lines for which technical studies are underway Any decision to apply the requirements of the present standard to new overhead line projects for which technical studies are underway shall be stipulated in the Project Specification. (ncpt) FR.5 Application to overhead lines under construction The requirements of the present standard do not apply to overhead lines under construction. (ncpt) FR.1 Application to radio telecommunication equipment Part 1 and Part 2-8 apply to radio telecommunication equipment mounted on the towers of new overhead lines, particularly with respect to wind and ice assumptions. Radio equipment shall be arranged on the support so that it can be accessed and operations performed in accordance with safety regulations.