Vážení zákazníci, v letošním roce budeme expedovat poslední objednávky ve středu 18. 12. 2024.

Těšíme se s vámi na shledanou od pondělí 06. 01. 2025.

 

Menu
0
Total price
0 €
PRICES include / exclude VAT
Homepage>BS EN 9200:2004 Programme management. Guidelines for project management specification
Sponsored link
sklademVydáno: 2005-01-31
BS EN 9200:2004 Programme management. Guidelines for project management specification

BS EN 9200:2004

Programme management. Guidelines for project management specification

Format
Availability
Price and currency
Anglicky Secure PDF
Immediate download
356.68 €
You can read the standard for 1 hour. More information in the category: E-reading
Reading the standard
for 1 hour
35.67 €
You can read the standard for 24 hours. More information in the category: E-reading
Reading the standard
for 24 hours
107.00 €
Anglicky Hardcopy
In stock
356.68 €
Označení normy:BS EN 9200:2004
Počet stran:48
Vydáno:2005-01-31
ISBN:0 580 45362 6
Status:Standard
DESCRIPTION

BS EN 9200:2004


This standard BS EN 9200:2004 Programme management. Guidelines for project management specification is classified in these ICS categories:
  • 49.140 Space systems and operations
For a given aerospace project, the present document is intended to be used as a reference to current best practices. These can be used as a guideline for the creation and negotiation of the project management specification between a customer and a supplier, and hence lead to the creation of the project management plan. It may be used for any project utilising several actors at different levels. In particular in the case of large projects it presents provisions recommended for the management of a project according to (see Figure 1): - project organisation, - work breakdown structure, - phasing and scheduling, - risk management, - configuration management, - documentation management, - interfaces with other disciplines, - project monitoring and control, - technical performance control, - cost control, - schedule control, - resource management, - quality assurance, - project closure.