Menu
0
Total price
0 €
PRICES include / exclude VAT
Homepage>BS EN IEC 60709:2019 Nuclear power plants. Instrumentation, control and electrical systems important to safety. Separation
Sponsored link
sklademVydáno: 2019-07-15
BS EN IEC 60709:2019 Nuclear power plants. Instrumentation, control and electrical systems important to safety. Separation

BS EN IEC 60709:2019

Nuclear power plants. Instrumentation, control and electrical systems important to safety. Separation

Format
Availability
Price and currency
Anglicky Secure PDF
Immediate download
354.57 €
You can read the standard for 1 hour. More information in the category: E-reading
Reading the standard
for 1 hour
35.46 €
You can read the standard for 24 hours. More information in the category: E-reading
Reading the standard
for 24 hours
106.37 €
Anglicky Hardcopy
In stock
354.57 €
Označení normy:BS EN IEC 60709:2019
Počet stran:52
Vydáno:2019-07-15
ISBN:978 0 580 97761 9
Status:Standard
DESCRIPTION

BS EN IEC 60709:2019


This standard BS EN IEC 60709:2019 Nuclear power plants. Instrumentation, control and electrical systems important to safety. Separation is classified in these ICS categories:
  • 33.120.10 Coaxial cables. Waveguides
  • 27.120.20 Nuclear power plants. Safety

1.1 General

This document is applicable to nuclear power plant instrumentation and control (I&C) and electrical systems and equipment, whose functions are required to be independent due to their contribution to:

  • a redundant or diverse safety group;

  • different defence in depth levels;

  • different safety classes and also with non-classified (NC) systems.

It is also applicable to temporary installations which are part of those I&C and electrical systems important to safety (for example, auxiliary equipment for commissioning tests and experiments or mobile power supply systems). Clause 7 is intended particularly for electrical isolation, Clause 8 is intended particularly for the cabling and the arrangement of equipment of I&C and electrical systems important to safety.

This document applies to I&C and electrical systems of new nuclear power plants and to I&C and electrical upgrading or back-fitting of existing plants. For existing plants see 1.2 and 5.4.

Where independence is required by general safety standards such as IAEA safety guides, IEC 61513 (for I&C), IEC 63046 (for electrical systems) and other project constraints, one aspect of achieving this independence is physical separation and electrical isolation between the systems and their equipment that perform safety functions. This document defines the assessments needed and the technical requirements to be met for I&C and electrical systems, equipment or cables for which separation is required. Those means are to achieve adequate physical separation and electrical isolation between redundant sections of a system and between a higher and lower class systems. This separation is needed to prevent or minimise the impact on safety that could result from faults and failures which could be propagated or affect several sections of a system or several systems.

The requirements for functions, and their associated systems and equipment, to be independent are normally defined in detail in the project documentation; the method of determining and defining these requirements is not the subject of this document.

Following IAEA SSR-2/1 Requirement 21, separation means by physical separation, electrical isolation, functional independence and independence of communication are considered. In this document physical separation and electrical isolation are treated. Functional independence and independence of communication are not considered in this document. More details referring to functional independence, independence from control systems and independence of communication are given in Annex D.

1.2 Application: new and pre-existing plants

This document applies to the I&C and electrical of new nuclear power plants as well as to up-grading or back-fitting of existing plants.

For existing plants, only a subset of requirements is applicable and this subset is normally specified and argued at the beginning of any project.