Vážení zákazníci, v letošním roce budeme expedovat poslední objednávky ve středu 18. 12. 2024.

Těšíme se s vámi na shledanou od pondělí 06. 01. 2025.

 

Menu
0
Total price
0 €
PRICES include / exclude VAT
Homepage>BS EN ISO 10140-5:2021 Acoustics. Laboratory measurement of sound insulation of building elements Requirements for test facilities and equipment
Sponsored link
sklademVydáno: 2021-05-12
BS EN ISO 10140-5:2021 Acoustics. Laboratory measurement of sound insulation of building elements Requirements for test facilities and equipment

BS EN ISO 10140-5:2021

Acoustics. Laboratory measurement of sound insulation of building elements Requirements for test facilities and equipment

Format
Availability
Price and currency
Anglicky Secure PDF
Immediate download
357.95 €
You can read the standard for 1 hour. More information in the category: E-reading
Reading the standard
for 1 hour
35.80 €
You can read the standard for 24 hours. More information in the category: E-reading
Reading the standard
for 24 hours
107.39 €
Anglicky Hardcopy
In stock
357.95 €
Označení normy:BS EN ISO 10140-5:2021
Počet stran:48
Vydáno:2021-05-12
ISBN:978 0 539 06687 6
Status:Standard
DESCRIPTION

BS EN ISO 10140-5:2021


This standard BS EN ISO 10140-5:2021 Acoustics. Laboratory measurement of sound insulation of building elements is classified in these ICS categories:
  • 91.120.20 Acoustics in building. Sound insulation

This document specifies laboratory test facilities and equipment for sound insulation measurements of building elements, such as:

  1. components and materials;

  2. building elements;

  3. technical elements (small building elements);

  4. sound insulation improvement systems.

It is applicable to laboratory test facilities with suppressed radiation from flanking elements and structural isolation between source and receiving rooms.

This document specifies qualification procedures for use when commissioning a new test facility with equipment for sound insulation measurements. It is intended that these procedures be repeated periodically to ensure that there are no issues with the equipment and the test facility.