Vážení zákazníci, v letošním roce budeme expedovat poslední objednávky ve středu 18. 12. 2024.

Těšíme se s vámi na shledanou od pondělí 06. 01. 2025.

 

Menu
0
Total price
0 €
PRICES include / exclude VAT
Homepage>BS EN ISO 7817-1:2024 - TC Tracked Changes. Building Information Modelling. Level of Information Need Concepts and principles
Sponsored link
sklademVydáno: 2024-07-11
BS EN ISO 7817-1:2024 - TC Tracked Changes. Building Information Modelling. Level of Information Need Concepts and principles

BS EN ISO 7817-1:2024 - TC

Tracked Changes. Building Information Modelling. Level of Information Need Concepts and principles

Format
Availability
Price and currency
Anglicky Secure PDF
Immediate download
380.17 €
Anglicky Hardcopy
In stock
380.17 €
Označení normy:BS EN ISO 7817-1:2024 - TC
Počet stran:76
Vydáno:2024-07-11
ISBN:978 0 539 32552 2
Status:Tracked Changes
DESCRIPTION

BS EN ISO 7817-1:2024 - TC


This standard BS EN ISO 7817-1:2024 - TC Tracked Changes. Building Information Modelling. Level of Information Need is classified in these ICS categories:
  • 91.010.01 Construction industry in general
  • 35.240.67 IT applications in building and construction industry
This document specifies concepts and principles to establish a methodology for specifying level of information need and information deliveries in a consistent way when using building information modelling (BIM). This document specifies the characteristics of different levels used for defining the detail and extent of information required to be exchanged and delivered throughout the life cycle of built assets. It gives guidelines for principles required to specify information needs. The concepts and principles in this document can be applied for a general information exchange and while in progress, for a generally agreed way of information exchange between parties in a collaborative work process, as well as for an appointment with specified information delivery. This document is applicable to the whole life cycle of any built asset, including strategic planning, initial design, engineering, development, documentation and construction, day-to-day operation, maintenance, refurbishment, repair and end-of-life.