Menu
0
Total price
0 €
PRICES include / exclude VAT
Homepage>BS ISO 10784-3:2011 Space systems. Early operations Commissioning report
Sponsored link
sklademVydáno: 2012-01-31
BS ISO 10784-3:2011 Space systems. Early operations Commissioning report

BS ISO 10784-3:2011

Space systems. Early operations Commissioning report

Format
Availability
Price and currency
Anglicky Secure PDF
Immediate download
183.40 €
You can read the standard for 1 hour. More information in the category: E-reading
Reading the standard
for 1 hour
18.34 €
You can read the standard for 24 hours. More information in the category: E-reading
Reading the standard
for 24 hours
55.02 €
Anglicky Hardcopy
In stock
183.40 €
Označení normy:BS ISO 10784-3:2011
Počet stran:18
Vydáno:2012-01-31
ISBN:978 0 580 66619 3
Status:Standard
DESCRIPTION

BS ISO 10784-3:2011


This standard BS ISO 10784-3:2011 Space systems. Early operations is classified in these ICS categories:
  • 49.140 Space systems and operations

A general definition of initialization is that it begins at separation of the spacecraft (SC) from the launcher. In some cases, a more exact definition will be that initialization begins in flight, upon planned change in mode or state of the SC from the launch configuration. Commissioning is completed when the SC, including its payload, is certified for initial mission operations. Prior to certification for mission operations, the SC is described as a test article in the three parts of ISO 10784. ISO 10784 does not include a requirement for contingency plans, but does include a statement of the need for contingency planning.

This part of ISO 10784 outlines general descriptive information for SC initialization and commissioning as might be appropriate for programme management, project engineering or programme test documentation. Since the SC is considered a test article at this phase of its operational life, ISO 17566 is used as a normative reference in constructing the commissioning report. It provides SC manufacturers, SC operators and other stakeholders with a common language and form to verify and document spacecraft initialization and commissioning prior to normal SC mission operations.