Menu
0
Total price
0 €
PRICES include / exclude VAT
Homepage>BS ISO 37160:2020 Smart community infrastructure. Electric power infrastructure. Measurement methods for the quality of thermal power infrastructure and requirements for plant operations and management
sklademVydáno: 2020-04-02
BS ISO 37160:2020 Smart community infrastructure. Electric power infrastructure. Measurement methods for the quality of thermal power infrastructure and requirements for plant operations and management

BS ISO 37160:2020

Smart community infrastructure. Electric power infrastructure. Measurement methods for the quality of thermal power infrastructure and requirements for plant operations and management

Format
Availability
Price and currency
Anglicky Secure PDF
Immediate download
247.28 €
You can read the standard for 1 hour. More information in the category: E-reading
Reading the standard
for 1 hour
24.73 €
You can read the standard for 24 hours. More information in the category: E-reading
Reading the standard
for 24 hours
74.18 €
Anglicky Hardcopy
In stock
247.28 €
Označení normy:BS ISO 37160:2020
Počet stran:28
Vydáno:2020-04-02
ISBN:978 0 580 51711 2
Status:Standard
DESCRIPTION

BS ISO 37160:2020


This standard BS ISO 37160:2020 Smart community infrastructure. Electric power infrastructure. Measurement methods for the quality of thermal power infrastructure and requirements for plant operations and management is classified in these ICS categories:
  • 27.100 Power stations in general
  • 13.020.20 Environmental economics

This document specifies methods for measuring the quality of thermal power infrastructure (QTPI) during the operational phase and requirements for operations and management activities.

It is intended for use by electric power providers, including public utilities and independent power producers (hereinafter collectively referred to as power plant operators), as well as relevant stakeholders that intend to maintain and improve QTPI.

NOTE

The selection and importance of evaluation indicators resulting from the implementation of this document can vary depending on the characteristics of the power plant operator.