Menu
0
Total price
0 €
PRICES include / exclude VAT
Homepage>IEC 61850-4:2011 - Communication networks and systems for power utility automation - Part 4: System and project management
Sponsored link
sklademVydáno: 2011-04-11
IEC 61850-4:2011 - Communication networks and systems for power utility automation - Part 4: System and project management

IEC 61850-4:2011

Communication networks and systems for power utility automation - Part 4: System and project management

Réseaux et systèmes de communication pour l'automatisation des systèmes électriques - Partie 4: Gestion du système et gestion de projet

Format
Availability
Price and currency
Anglicky/Francouzsky Hardcopy
skladem
279.16 €
Anglicky/Francouzsky PDF
Immediate download
279.16 €
Označení normy:IEC 61850-4:2011
Vydáno:2011-04-11
Jazyk:Anglicky/Francouzsky
DESCRIPTION

IEC 61850-4:2011

IEC 61850-4:2011 applies to projects associated with process near automation systems of power utilities (UAS, utility automation system), like e.g. substation automation systems (SAS). It defines the system and project management for UAS systems with communication between intelligent electronic devices (IEDs) in the substation respective plant and the related system requirements. This second edition constitutes a technical revision to align the document more closely with the other parts of the IEC 61850 series, in addition to enlarging the scope from substation automation systems to all utility automation systems. This publication is of core relevance for Smart Grid.