IEC 61850-7-410:2012
Communication networks and systems for power utility automation - Part 7-410: Basic communication structure - Hydroelectric power plants - Communication for monitoring and control
Réseaux et systèmes de communication pour l'automatisation des systèmes électriques - Partie 7-410: Structure de communication de base - Centrales hydroélectriques - Communication pour le contrôle-commande
Označení normy: | IEC 61850-7-410:2012 |
Vydáno: | 2012-10-30 |
Jazyk: | Anglicky/Francouzsky |
IEC 61850-7-410:2012
IEC 61850-7-410:2012 specifies the additional common data classes, logical nodes and data objects required for the use of IEC 61850 in a hydropower plant. The main changes with respect to the previous edition are as follows: - the logical nodes in IEC 61850-7-410:2007 that were not specific to hydropower plants have been transferred to IEC 61850-7-4:2010; - the definitions of logical nodes in this edition of IEC 61850-7-410 have been updated; - most of the modelling examples and background information included in IEC 61850-7-410:2007 have been transferred to IEC/TR 61850-7-510. This new edition of IEC 61850-7-410 includes additional general-purpose logical nodes that were not included in IEC 61850-7-4:2010, but are required in order to represent the complete control and monitoring system of a hydropower plant.