Menu
0
Total price
0 €
PRICES include / exclude VAT
Homepage>ISO/TR 13624-2:2009-Petroleum and natural gas industries — Drilling and production equipment-Part 2: Deepwater drilling riser methodologies, operations, and integrity technical report
Sponsored link
sklademVydáno: 2009
ISO/TR 13624-2:2009-Petroleum and natural gas industries — Drilling and production equipment-Part 2: Deepwater drilling riser methodologies, operations, and integrity technical report

ISO/TR 13624-2:2009

ISO/TR 13624-2:2009-Petroleum and natural gas industries — Drilling and production equipment-Part 2: Deepwater drilling riser methodologies, operations, and integrity technical report

Format
Availability
Price and currency
Anglicky PDF
Immediate download
264.58 €
Anglicky Hardcopy
In stock
264.58 €
Označení normy:ISO/TR 13624-2:2009
Počet stran:89
Vydání:1
Vydáno:2009
Jazyk:Anglicky
DESCRIPTION

ISO/TR 13624-2:2009


ISO/TR 13624-2:2009 pertains to mobile offshore drilling units that employ a subsea BOP stack deployed at the seafloor. It is intended that the drilling riser analysis methodologies discussed in this part of ISO 13624 be used and interpreted in the context of ISO 13624-1.