Menu
0
Total price
0 €
PRICES include / exclude VAT
Homepage>PD IEC TR 63335:2021 Nuclear power plants. Instrumentation and control systems, control rooms and electrical power systems. Specific features of small modular reactors and needs regarding standards
Sponsored link
sklademVydáno: 2021-02-09
PD IEC TR 63335:2021 Nuclear power plants. Instrumentation and control systems, control rooms and electrical power systems. Specific features of small modular reactors and needs regarding standards

PD IEC TR 63335:2021

Nuclear power plants. Instrumentation and control systems, control rooms and electrical power systems. Specific features of small modular reactors and needs regarding standards

Format
Availability
Price and currency
Anglicky Secure PDF
Immediate download
254.31 €
You can read the standard for 1 hour. More information in the category: E-reading
Reading the standard
for 1 hour
25.43 €
You can read the standard for 24 hours. More information in the category: E-reading
Reading the standard
for 24 hours
76.29 €
Anglicky Hardcopy
In stock
254.31 €
Označení normy:PD IEC TR 63335:2021
Počet stran:32
Vydáno:2021-02-09
ISBN:978 0 539 15667 6
Status:Standard
DESCRIPTION

PD IEC TR 63335:2021


This standard PD IEC TR 63335:2021 Nuclear power plants. Instrumentation and control systems, control rooms and electrical power systems. Specific features of small modular reactors and needs regarding standards is classified in these ICS categories:
  • 27.120.20 Nuclear power plants. Safety

This document identifies a number of issues of particular importance to light water Small Modular Reactors (SMRs), which are not currently adequately addressed by existing IEC SC 45A standards, and that could be considered when revising existing publications or that could be the object of new work item proposals. Whether each of these issues will indeed be addressed, and if so in which publication, will be the decision of each SC 45A working group.

Though there are a number of advanced Generation IV SMR projects underway, their specific needs are not covered by this document.

This document is organized as follows:

  • Clause 5 presents the main features of SMRs that are not typically found in large reactors or that are of particular importance for SMRs, and that could require specific or additional requirements and recommendations over those already provided in IEC SC 45A standards.

  • Clause 6 suggests, for each working group, a number of issues that could be considered in the revision of existing publications or as subjects for new work items.

  • Clause 7 suggests topics of importance to SMRs but that do not fit in the current scope of existing working groups.