Menu
0
Total price
0 €
PRICES include / exclude VAT
Homepage>PD IEC TS 62600-103:2018 Marine energy. Wave, tidal and other water current converters Guidelines for the early stage development of wave energy converters. Best practices and recommended procedures for the testing of pre-prototype devices
sklademVydáno: 2022-06-20
PD IEC TS 62600-103:2018 Marine energy. Wave, tidal and other water current converters Guidelines for the early stage development of wave energy converters. Best practices and recommended procedures for the testing of pre-prototype devices

PD IEC TS 62600-103:2018

Marine energy. Wave, tidal and other water current converters Guidelines for the early stage development of wave energy converters. Best practices and recommended procedures for the testing of pre-prototype devices

Format
Availability
Price and currency
Anglicky Secure PDF
Immediate download
345.31 €
You can read the standard for 1 hour. More information in the category: E-reading
Reading the standard
for 1 hour
34.53 €
You can read the standard for 24 hours. More information in the category: E-reading
Reading the standard
for 24 hours
103.59 €
Anglicky Hardcopy
In stock
345.31 €
Označení normy:PD IEC TS 62600-103:2018
Počet stran:64
Vydáno:2022-06-20
ISBN:978 0 539 22844 1
Status:Standard
DESCRIPTION

PD IEC TS 62600-103:2018


This standard PD IEC TS 62600-103:2018 Marine energy. Wave, tidal and other water current converters is classified in these ICS categories:
  • 27.140 Hydraulic energy engineering
IEC TS 62600-103:2018(E) is concerned with the sub-prototype scale development of wave energy converters. It includes the wave tank test programmes, where wave conditions are controlled so they can be scheduled, and the first large-scale sea trials, where sea states occur naturally and the programmes are adjusted and flexible to accommodate the conditions. This document describes the minimum test programmes that form the basis of a structured technology development schedule. For each testing campaign, the prerequisites, goals and minimum test plans are specified.