Vážení zákazníci, v letošním roce budeme expedovat poslední objednávky ve středu 18. 12. 2024.

Těšíme se s vámi na shledanou od pondělí 06. 01. 2025.

 

Menu
0
Total price
0 €
PRICES include / exclude VAT
Homepage>PD ISO/TR 24679-2:2017 Fire safety engineering. Performance of structure in fire Example of an airport terminal
Sponsored link
sklademVydáno: 2017-07-31
PD ISO/TR 24679-2:2017 Fire safety engineering. Performance of structure in fire Example of an airport terminal

PD ISO/TR 24679-2:2017

Fire safety engineering. Performance of structure in fire Example of an airport terminal

Format
Availability
Price and currency
Anglicky Secure PDF
Immediate download
357.88 €
You can read the standard for 1 hour. More information in the category: E-reading
Reading the standard
for 1 hour
35.79 €
You can read the standard for 24 hours. More information in the category: E-reading
Reading the standard
for 24 hours
107.36 €
Anglicky Hardcopy
In stock
357.88 €
Označení normy:PD ISO/TR 24679-2:2017
Počet stran:46
Vydáno:2017-07-31
ISBN:978 0 580 97269 0
Status:Standard
DESCRIPTION

PD ISO/TR 24679-2:2017


This standard PD ISO/TR 24679-2:2017 Fire safety engineering. Performance of structure in fire is classified in these ICS categories:
  • 13.220.01 Protection against fire in general

This document provides a fire engineering application relative to fire resistance assessment of an airport terminal structure according to the methodology given in ISO 24679‑1 . It follows step by step the procedure given by ISO 24679‑1 . Some requirements relative to Chinese building regulation are taken into account concerning the fire scenarios.

The fire safety engineering applied to an airport terminal takes into account the real fire data based in fire tests. It is important to note that the intervention of fire service brigade dedicated to this airport, located approximately 1 km away, has been taken into account in definition of fire scenarios. For the fire modelling, both fire extinguishing system and the smoke extraction are not considered but the fire fighter intervention has been taken into account 10 min after the starting of fire.