Menu
0
Total price
0 €
PRICES include / exclude VAT
Homepage>UNE 60670-9:2023 Gas installations pipework supplied at maximum operating pressure (MOP) up to and including 5 bar. Part 9: Previous tests of the supply and commissioning
sklademVydáno: 2023-10-04
UNE 60670-9:2023 Gas installations pipework supplied at maximum operating pressure (MOP) up to and including 5 bar. Part 9: Previous tests of the supply and commissioning

UNE 60670-9:2023

Gas installations pipework supplied at maximum operating pressure (MOP) up to and including 5 bar. Part 9: Previous tests of the supply and commissioning

Instalaciones receptoras de gas suministradas a una presión máxima de operación (MOP) inferior o igual a 5 bar. Parte 9: Pruebas previas al suministro y puesta en servicio.

Format
Availability
Price and currency
Španělsky PDF
Immediate download
40.80 €
Španělsky Hardcopy
In stock
40.80 €
Označení normy:UNE 60670-9:2023
Počet stran:7
Vydáno:2023-10-04
Status:Norma
DESCRIPTION

This standard UNE 60670-9:2023 Gas installations pipework supplied at maximum operating pressure (MOP) up to and including 5 bar. Part 9: Previous tests of the supply and commissioning is classified in these ICS categories:

  • 91.140.40
Categories: