Cena s DPH / bez DPH
Hlavní stránka>IEC 61557-7:2019+AMD1:2023 CSV - Electrical safety in low voltage distribution systems up to 1 000 V AC and 1 500 V DC - Equipment for testing, measuring or monitoring of protective measures - Part 7: Phase sequence
Sponsored link
sklademVydáno: 2023-08-25
IEC 61557-7:2019+AMD1:2023 CSV - Electrical safety in low voltage distribution systems up to 1 000 V AC and 1 500 V DC - Equipment for testing, measuring or monitoring of protective measures - Part 7: Phase sequence

IEC 61557-7:2019+AMD1:2023 CSV

Electrical safety in low voltage distribution systems up to 1 000 V AC and 1 500 V DC - Equipment for testing, measuring or monitoring of protective measures - Part 7: Phase sequence

Sécurité électrique dans les réseaux de distribution basse tension au plus égale à 1 000 V en courant alternatif et 1 500 V en courant continu - Dispositifs de contrôle, de mesure ou de surveillance de mesures de protection - Partie 7: Ordre de phases

Formát
Dostupnost
Cena a měna
Anglicky/Francouzsky Tisk
skladem
3718 Kč
Anglicky/Francouzsky PDF
K okamžitému stažení
3718 Kč
Označení normy:IEC 61557-7:2019+AMD1:2023 CSV
Vydáno:2023-08-25
Jazyk:Anglicky/Francouzsky
Popis

IEC 61557-7:2019+AMD1:2023 CSV

IEC 61557-7:2019+AMD1:2023 specifies the requirements applicable to measuring equipment for testing the phase sequence in three-phase distribution systems. Indication of the phase sequence can be mechanical, visual and/or audible. This document does not apply to additional measurements for other quantities. It does not apply to monitoring relays. IEC 61557-7:2019 cancels and replaces the second edition published in 2007. This edition constitutes a technical revision. This edition includes the following changes with respect to the previous edition: a) alignment of the structure with that of the whole IEC 61557 series; b) updated requirements in 4.3 in accordance with new editions of IEC 61010-1 and IEC 61010-031; c) the information on markings was extended; d) the information on the operating instructions was extended; e) complement to the information on the testing of leads; f) test leads for insulated conductors were introduced; g) Annex B was added with information on phase sequence tests and indications.