Cena s DPH / bez DPH
Sponsored link
sklademVydáno: 2011-04-11
IEC 61850-4:2011
Communication networks and systems for power utility automation - Part 4: System and project management
Réseaux et systèmes de communication pour l'automatisation des systèmes électriques - Partie 4: Gestion du système et gestion de projet
Formát
Dostupnost
Cena a měna
Anglicky/Francouzsky Tisk
skladem
7027 Kč
Anglicky/Francouzsky PDF
K okamžitému stažení
7027 Kč
Označení normy: | IEC 61850-4:2011 |
Vydáno: | 2011-04-11 |
Jazyk: | Anglicky/Francouzsky |
Popis
IEC 61850-4:2011
IEC 61850-4:2011 applies to projects associated with process near automation systems of power utilities (UAS, utility automation system), like e.g. substation automation systems (SAS). It defines the system and project management for UAS systems with communication between intelligent electronic devices (IEDs) in the substation respective plant and the related system requirements. This second edition constitutes a technical revision to align the document more closely with the other parts of the IEC 61850 series, in addition to enlarging the scope from substation automation systems to all utility automation systems. This publication is of core relevance for Smart Grid.