Cena s DPH / bez DPH
Hlavní stránka>IEC 62271-212:2022 RLV - High-voltage switchgear and controlgear - Part 212: Compact Equipment Assembly for Distribution Substation (CEADS) for AC voltages up to 52 kV
Sponsored link
sklademVydáno: 2022-06-29
IEC 62271-212:2022 RLV - High-voltage switchgear and controlgear - Part 212: Compact Equipment Assembly for Distribution Substation (CEADS) for AC voltages up to 52 kV

IEC 62271-212:2022 RLV

High-voltage switchgear and controlgear - Part 212: Compact Equipment Assembly for Distribution Substation (CEADS) for AC voltages up to 52 kV

Formát
Dostupnost
Cena a měna
Anglicky Tisk
skladem
12980 Kč
Anglicky PDF
K okamžitému stažení
12980 Kč
Označení normy:IEC 62271-212:2022 RLV
Vydáno:2022-06-29
Jazyk:Anglicky
Popis

IEC 62271-212:2022 RLV

IEC 62271-212:2022 RLV contains both the official IEC International Standard and its Redline version. The Redline version is available in English only and provides you with a quick and easy way to compare all the changes between the official IEC Standard and its previous edition. IEC 62271-212;2022 specifies the service conditions, rated characteristics, general structural requirements and test methods of the assemblies of the main electrical functional units of a high-voltage transformer substation, duly interconnected, for AC voltages up to and including 52 kV on the high-voltage side and service frequency 50 Hz or 60 Hz. The CEADS is cable‑connected to the high-voltage network for indoor and outdoor applications of restricted access. This second edition cancels and replaces the first edition published in 2016. This edition constitutes a technical revision. This edition includes the following significant technical changes with respect to the previous edition: - clause numbering aligned with IEC 62271-1:2017, - rewording of title and scope of the document, - implement changes on internal arc definition and testing following the evolution of prefabricated substation concept according to IEC 62271-202, - general review of main test procedures such as temperature rise or dielectric test on interconnections, considering control equipment, communication, smart grid devices and integration of components, - general review of installation, operation, safety and maintenance requirements.