Cena s DPH / bez DPH
Sponsored link
sklademVydáno: 2021
IWA 33-3:2021
IWA 33-3:2021-Technical guidelines for the development of small hydropower plants-Part 3: Design principles and requirements
Formát
Dostupnost
Cena a měna
Anglicky PDF
K okamžitému stažení
6600 Kč
Anglicky Tisk
Skladem
6600 Kč
Označení normy: | IWA 33-3:2021 |
Počet stran: | 80 |
Vydání: | 1 |
Vydáno: | 2021 |
Jazyk: | Anglicky |
Popis
IWA 33-3:2021
This document specifies the general principles and basic requirements of design for small hydropower (SHP) projects up to 30 MWe, mainly including hydrology, geology, energy calculations, project layout, hydraulics, electromechanical equipment selection, construction planning, project cost estimates, economic appraisal, social and environmental assessments. Application of this document is intended to be site specific, with the principles and requirements of design applied in accordance with the needs of proposed hydropower plant.