Cena s DPH / bez DPH
Hlavní stránka>PD CLC/TS 50625-4:2017 Collection, logistics & treatment requirements for WEEE Specification for the collection and logistics associated with WEEE
Sponsored link
sklademVydáno: 2017-09-07
PD CLC/TS 50625-4:2017 Collection, logistics & treatment requirements for WEEE Specification for the collection and logistics associated with WEEE

PD CLC/TS 50625-4:2017

Collection, logistics & treatment requirements for WEEE Specification for the collection and logistics associated with WEEE

Formát
Dostupnost
Cena a měna
Anglicky Zabezpečené PDF
K okamžitému stažení
4650 Kč
Čtěte normu po dobu 1 hodiny. Více informací v kategorii E-READING
Čtení normy
na 1 hodinu
465.00 Kč
Čtěte normu po dobu 24 hodin. Více informací v kategorii E-READING
Čtení normy
na 24 hodin
1395.00 Kč
Anglicky Tisk
Skladem
4650 Kč
Označení normy:PD CLC/TS 50625-4:2017
Počet stran:20
Vydáno:2017-09-07
ISBN:978 0 580 95209 8
Status:Standard
Popis

PD CLC/TS 50625-4:2017


This standard PD CLC/TS 50625-4:2017 Collection, logistics & treatment requirements for WEEE is classified in these ICS categories:
  • 31.220.01 Electromechanical components in general
  • 29.100.01 Components for electrical equipment in general
  • 13.030.99 Other standards related to wastes

This Technical Specification applies to the following processes: collection, handling, sorting, storage, preparation for transport and transport of WEEE. It is applicable to all WEEE prior to arriving at the treatment facility or arriving at a preparing for re-use facility.

This Technical Specification addresses all operators that perform collection and logistics processes.

This Technical Specification does not cover treatment of WEEE. In the case of treatment activities undertaken at collection or logistics facilities, the EN 50625-series applies.

NOTE 1

Treatment activities include any form of dismantling, including the removal of cabling, components, such as circuit boards, compressors or parts of equipment (e.g. doors). Sorting is not considered a treatment activity as long as no physical alterations to the WEEE take place.

WEEE can potentially enter the logistics chain at any of the identified locations below.

[Image removed.]

NOTE 2

The Technical Specification does not cover activities at the preparing for re-use facility and the treatment facility; these are covered in the EN 50625-series and prEN 50614 .

NOTE 3

National law may specify which operators are allowed to collect WEEE.