Cena s DPH / bez DPH
Hlavní stránka>UNE 60670-9:2023 Gas installations pipework supplied at maximum operating pressure (MOP) up to and including 5 bar. Part 9: Previous tests of the supply and commissioning
sklademVydáno: 2023-10-04
UNE 60670-9:2023 Gas installations pipework supplied at maximum operating pressure (MOP) up to and including 5 bar. Part 9: Previous tests of the supply and commissioning

UNE 60670-9:2023

Gas installations pipework supplied at maximum operating pressure (MOP) up to and including 5 bar. Part 9: Previous tests of the supply and commissioning

Instalaciones receptoras de gas suministradas a una presión máxima de operación (MOP) inferior o igual a 5 bar. Parte 9: Pruebas previas al suministro y puesta en servicio.

Formát
Dostupnost
Cena a měna
Španělsky PDF
K okamžitému stažení
1028 Kč
Španělsky Tisk
Skladem
1028 Kč
Označení normy:UNE 60670-9:2023
Počet stran:7
Vydáno:2023-10-04
Status:Norma
Popis

This standard UNE 60670-9:2023 Gas installations pipework supplied at maximum operating pressure (MOP) up to and including 5 bar. Part 9: Previous tests of the supply and commissioning is classified in these ICS categories:

  • 91.140.40
: